MÁV Group CEO Closes Railway Workshop Near Keleti Station Due to Safety Hazards
MÁV Group Chief Executive Officer Zsolt Hegyi announced the immediate closure of the railway vehicle repair workshop located next to Keleti Railway Station. The closure takes effect immediately because the historic building houses a workshop roof made of wood that has rotted. Zsolt Hegyi stated that the rotten workshop roof makes daily work dangerous, necessitating immediate closure for worker safety.
Workshop Closure Details
The facility currently performs maintenance on 160 railway carriages at the workshop. These carriages serviced include InterCity, international, sleeping, and dining cars. MÁV management is organizing the transfer of maintenance tasks to other operational areas.
The company aims to restore part of the hall using temporary technical solutions as soon as possible. However, Zsolt Hegyi noted that the final restoration of the building is estimated to take years and cost billions of forints. MÁV management is investigating whether relocating the activity to a new, modern facility outside the city center is more practical than renovating the urban building.
Government Budget Increases
Minister of Transport Dávid Vitézy announced that the 2027 budget will allocate 80 billion forints for railway track and station restoration. This figure represents a significant increase from the previous budget allocation of 30 billion forints. The specific details regarding the 2027 budget increase from 30 billion forints to 80 billion forints are reported by media reports.
The MÁV Group CEO emphasized that the decision to close the workshop is not a matter of compromise but a necessity for worker safety. The closure directly addresses the immediate structural risks posed by the decaying wooden roof structure.
Future Operational Plans
MÁV management is actively organizing the transfer of maintenance tasks currently performed at the closed workshop. The company is exploring options to ensure continuous service delivery for the 160 railway carriages that require servicing. These carriages include InterCity, international, sleeping, and dining cars.
The company intends to restore part of the hall using temporary technical solutions as soon as possible to mitigate immediate operational disruptions. However, Zsolt Hegyi confirmed that the final restoration of the building is estimated to take years and cost billions of forints.
The ongoing investigation into relocating the activity to a new, modern facility outside the city center remains a key consideration for MÁV management. This strategic review aims to balance the need for modern infrastructure with the realities of urban property constraints.
Glossary
- Keleti Railway Station — Keleti Railway Station is located in the East, Central. It is a location associated with the railway vehicle repair workshop.
- MÁV Group — The MÁV Group is the Hungarian national railway company. It includes the Hungarian State Railways and its subsidiaries.
- InterCity — InterCity refers to a type of service that runs on premium IC+ coaches. These coaches operate on routes including Szeged, Lake Balaton, and the Circular Intercity service.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0